Introduction to 5333 Connecticut Dc
Let's dive into the details surrounding 5333 Connecticut Dc. The site manager and crew arrived late at 7:20A; perhaps they were stuck in the infamous Military Road traffic, shown at the left of ...
5333 Connecticut Dc Comprehensive Overview
Another full day of constructions activity around the whole site. Over eighty dump truck loads of dirt left the site. From beautiful sunrise at 6A to 5P, full day of work on Thursday, September 21, 2013, 11 A.M. to 12:30 P.M. EST Rally To Fight Cafritz Bulldozers Chevy Chase residents took legal ...
At 6A the first dump truck was queued on
Summary & Highlights for 5333 Connecticut Dc
- At 9:20A, let the trucking begin -- and for the rest of the day, the dump trucks came in caravans to remove the site, with both the ...
- The backhoe buried the pool of water in the center of the site, then proceeded to pull down the old retaining wall on the far ...
- A beautiful red and gold sunrise lead into the Ballet of the Backhoes. At 9:45A the baby backhoe took front center stage for a few ...
- Baby backhoe spent the early morning digging down the northwest retaining walls. A white, full-jumpsuit with orange helmut ...
- Much like yesterday, a constant flow of work but little drama. What was noticeable was the flatness of two thirds of the ...
That wraps up our extensive overview of 5333 Connecticut Dc.